Član VIP
Smart Motor Stator Testing System (New)
Kɔc cï gam: Sistɛm kënë ee kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɔc cï gam
Detalji proizvoda
A.Bayan
Sistɛm kënë ee kɛ̈l ye kɛ̈l ye kɛ̈l ye kɛ̈l ye kɛ̈l ye kɛ̈l ye kɛ̈l ye kɛ̈l ye kɛ̈l ye
II.Features ye
1, awowa ye tïŋ: three-phase motor turn.
2, Power supply: AC220V ± 22V, AC10A 50Hz ± 2 Hz (System working power).
3, test power supply: three phase power supply AC380V 50Hz 25A
4, tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛoC
Humidity ≤85% RH
A tãŋuan,Teknik Indikator
|
|
|
Test Project
|
Testing Conditions (Tɛstɛr)
|
Testing Scale
|
Precision
|
|
1
|
Yök
|
|
Test Current <=25A
|
Gɛlɛ/Gɛlɛ
|
|
4.Testing System Operation Description (Testing System Operation Description)
4.1Kabinet ye nyuɔɔth
4.2、 Operating Panel Description
1) Lamp de alarm de kolɛr atɔ̈u: a nyuɔɔth tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ
2) Panel de luɔɔi: ye luɔɔi de luɔɔi de luɔɔi de luɔɔi de luɔɔi de luɔɔi de luɔɔi de luɔɔi de luɔɔi de luɔɔi de luɔɔi.
3) Sliding cap, close switch: ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r
4) Test bench: ye luɔɔi bɛ̈n looi bɛ̈n looi bɛ̈n looi bɛ̈n looi bɛ̈n looi bɛ̈n looi.
5) Test voltage: nyoth current given son power supply voltage, adjust external three-phase regulator to change the tested voltage, adjust different voltage according to different stators, high voltage will make the tested stator hot or damaged, low voltage false rotor can't rotate, so test voltage to choose the right.
6) Lamp test (left station): Lamp ye tɔ̈ɔ̈u ye tɔ̈ɔ̈u ye tɔ̈ɔ̈u ye tɔ̈ɔ̈u ye tɔ̈ɔ̈u ye tɔ̈ɔ̈u ye tɔ̈ɔ̈u
7) Lamp ye tɛmɛ (tɛmɛ donyi): Lamp ye tɛmɛ ye tɛmɛ ye tɛmɛ donyi.
8) Power switch: tɔ̈ɔ̈u switch në "off" indication switch, tɔ̈ɔ̈u në "open" indication switch.
9)Button Stop Emergency: Click on Emergency Stop, stop all power supply, and don't automatically reset. Button Stop Emergency: Click on Emergency Stop, stop all power supply, and don't automatically reset.
10)Button de rotation positive: a ye tɛmɛ yen, a yira ko stator ye tɛmɛ yen ye rot ye rot ye rot ye rot ye rot ye rot ye rot ye rot ye rot ye rot ye rot ye rot ye rot ye rot ye rot ye rot. Ni a tɛmɛ a tɛmɛ a tɛmɛ a tɛmɛ a tɛmɛ a tɛmɛ a tɛmɛ a tɛmɛ a tɛmɛ a tɛmɛ a tɛmɛ a tɛmɛ a tɛmɛ Na cï tɛmɛ, ka tɛmɛ, ka tɛmɛ, ka tɛmɛ, ka tɛmɛ, ka tɛmɛ, ka tɛmɛ, ka tɛmɛ, ka tɛmɛ, ka tɛmɛ, ka tɛmɛ, ka tɛmɛ
11)Button reverse: a ye tɛmɛ a ye tɛmɛ a ye tɛmɛ a ye tɛmɛ a ye tɛmɛ a ye tɛmɛ a ye tɛmɛ a ye tɛmɛ a ye tɛmɛ a ye tɛmɛ a ye. Ni a tɛmɛ a tɛmɛ a tɛmɛ a tɛmɛ a tɛmɛ a tɛmɛ a tɛmɛ a tɛmɛ a tɛmɛ a tɛmɛ a tɛmɛ a tɛmɛ a tɛmɛ Na ye tɛmɛ yen, a ye tɛmɛ yen, a ye tɛmɛ yen, a ye tɛmɛ yen, a ye tɛmɛ yen, a ye tɛmɛ yen, a ye tɛmɛ yen, a ye tɛmɛ yen, a ye tɛmɛ yen, a ye tɛmɛ yen.
12)Lëk tɛ̈n ye statior ye rot looi ka tɛ̈n ye rot looi ka tɛ̈n ye rot looi ka tɛ̈n ye rot looi ka tɛ̈n ye rot looi. Ye tɛ̈n, stator ye tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ.
4.3、 Operating Desk Description
(1) Gɛl ye gël ye gël ye gël ye gël ye gël ye gël ye gël ye gël ye gël ye gël ye gël ye gël ye gël ye gël ye gël ye gël ye gël ye gël ye gël
(2) Tɛmɛ Trinity clip ye tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛm
Lɔ̈ɔ̈m ye kɔc cɔl 'sliding protective cover' ye kɔc cɔl 'left station system' ye kɔc cɔl 'auto start test' ye kɔc cɔl 'auto stop test' ye kɔc cɔl 'auto stop test'.
Lɔ̈ɔ̈m ye kɔc gël ye kɔc gël ye kɔc gël ye kɔc gël ye kɔc gël ye kɔc gël ye kɔc gël ye kɔc gël ye kɔc gël ye kɔc gël ye kɔc gël ye kɔc gël
Lɔ̈ɔ̈i de thëm ye tɔ̈ɔ̈u në kaabinet de electrical partition de kaabinet de kaabinet de kaabinet de kaabinet de kaabinet de kaabinet de kaabinet de kaabinet de kaabinet de kaabinet de kaabinet de kaabinet de kaabinet de kaabinet de kaabinet de kaabinet (Lɔ̈k ye looi ye minit 1)
5.Power Connection
Line number: 1/2/GND connect system working power AC220V.
3-phase power supply ye 3-phase pressure regulator ye. Ajuiɛɛr ye tɔ̈u në line number: 100/101/102. Kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc.
六、Testing Model
3-phase 3-wire test method (3-phase 6-wire manual short connection U2/V2/W2):
7.Test Project
Test de rotation: test de stator de clockwise wala reverse clockwise
8. Luɔi ku Kuɔɔny
8.1Luɔi:
a) Bï yïn ya tiit, ka yï cɔk tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ
b)N'a tɛ̈n yen tɛ̈n yen tɛ̈n yen tɛ̈n yen tɛ̈n yen tɛ̈n yen tɛ̈n yen tɛ̈n yen tɛ̈n yen tɛ̈n yen tɛ̈n yen tɛ̈
c)Walisa ka tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ
d)Walisa ka tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ
e) N'a wïc a tɔ̈ɔ̈u, a tɔ̈ɔ̈u ka tɔ̈ɔ̈u ka tɔ̈ɔ̈u ka tɔ̈ɔ̈u ka tɔ̈ɔ̈u!
f) Gɛɛr ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r!
8.2、System cabinet maintenance and protection:
1, try to use in a relatively dry environment, you can't use it for long periods in a very high humidity environment (air relative humidity doesn't exceed 85% RH, the highest temperature can't exceed 40°C).
2, cabinet de sistem bï ya tɔ̈ɔ̈u ka cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk
3, ka cïï bɛ̈n lëu ba cabinet ya tɔ̈ɔ̈u në kaam de kaam de kaam de kaam de kaam de kaam de kaam de kaam de kaam de kaam de kaam de kaam de kaam de kaam.
9. Supply Completeness
1, Stator Integrated Test System Cabinet 1 unit
2、夹具 1套
3, 15kVA regulator 1 set
4、说明书 1份
5、合格证 1份
6, Kart Garanti
Онлайн разпит
