Platform ye cɛl ye cɛl ye cɛl ye cɛl ye cɛl ye cɛl ye cɛl ye cɛl ye cɛl ye cɛl ye cɛl ye cɛl ye cɛl ye cɛl ye cɛl ye cɛl ye cɛl ye cɛl ye cɛl ye cɛl ye cɛl ye cɛl ye cɛl ye cɛl ye cɛl ye cɛl ye cɛl ye cɛl ye cɛl ye cɛl ye cɛl ye cɛl ye cɛl ye cɛl ye cɛl ye cɛl ye cɛl ye cɛl ye cɛl ye cɛl ye cɛl ye cɛl ye cɛl ye cɛl ye cɛl ye cɛl
Luɔɔi de baara ye looi, baara ye luɔɔi de V, T, U, swallow, round hole, long hole, etc. ye luɔɔi de baara ye luɔɔi de baara ye luɔɔi de baara ye luɔɔi de baara ye luɔɔi de baara ye luɔɔi de baara ye luɔɔi de baara ye luɔɔi de baara ye luɔɔi de baara ye luɔɔi de baara ye luɔɔi de baara Plateform ye cɔl cast iron ye tɔ̈u thïn, ye tɔ̈u thïn, ye tɔ̈u thïn, ye tɔ̈u thïn, ye tɔ̈u thïn, ye tɔ̈u thïn, ye tɔ̈u thïn:
A, thickness requirements: mainly includes the thickness of the work surface on the platform, the lateral thickness and height, and the thickness, height and density of the bottom gluten plate. A, thickness requirements: mainly includes the thickness of the work surface on the platform, the lateral thickness and height, and the thickness, height and density of the bottom gluten plate.
Kä ye kek looi: HT200-300, HB170-240.
3.Artificial annealing: 600-700 degrees high temperature annealing afterwards in the annealing furnace. 3.Artificial annealing: 600-700 degrees high temperature annealing afterwards in the annealing furnace.
4, natural aging: according to national standards should be 2-3 natural aging, because this process time is too long, the enterprise has not been able to wait as long as this because of capital turnover, much to the exciter by vibration aging instead. 4, natural aging: according to national standards should be 2-3 natural aging, because this process time is too long, the enterprise has not been able to wait as long as this because of capital turnover, much to the exciter by vibration aging instead. Na cɔk tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈
5, sand eye and air pores: Level 0 and 1 platform does not allow to have air pores and sand eye, level 2 and 3 can be filled with air pores and sand eye with the same material as the platform. Level 2 and 3 can be filled with air pores and sand eye with the same material as the platform. Lëk: Kɔnɔŋ ye kɔnɔŋ ye kɔnɔŋ ye kɔnɔŋ ye kɔnɔŋ ye kɔnɔŋ ye kɔnɔŋ ye kɔnɔŋ ye kɔnɔŋ ye.
6, Shovel scraping process: Artificial shovel scraping in the cast iron platform processing process is an important process, it determines the plane error size of the cast iron platform, and the contact point of the work surface. 6, shovel scraping process: artificial shovel scraping in the cast iron platform processing process is an important process, it determines the plane error size of the cast iron platform, and the contact point of the work surface. 0-level board platform ye 25 point ye ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ Platform 1 ye 20 point ye tɔ̈u yen, a ye 25 a a a a ye 25 a a a a a ye 25 A A A A ye 25 A A A A A ye 25 A A A A A ye 25 A A A A A ye 25 A A A A A A A ye 25 A
2nd level flat plate platform, a ka tɛmɛ 16 points ka tɛmɛ 25 a a a a 3rd level flat plate platform tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n Na cï bɛ̈ɛ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈ 7. Sand clean and painting: sand clean on the bottom of the platform, clean and spray red rust-proof paint. Sand clean and painting: sand clean on the bottom of the platform, clean and spray red rust-proof paint. A bɛ̈ɛ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈
8, Packaging requirements: mainly wooden packaging, try to choose thick wood covering the work surface on the platform, when making all closed packaging. 8, packaging requirements: mainly wooden packaging, try to choose thick wood covering the work surface on the platform, when making all closed packaging. Ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ. 9, transport requirements, after the platform loads, check if there is a suspension, if there is a suspension to be solid, avoid vibration. 9, transport requirements, after the platform loads, check if there is a suspension, if there is a suspension to be solid, avoid vibration. Platform ka tɔ̈ɔ̈u ka tɔ̈ɔ̈u ka tɔ̈ɔ̈u ka tɔ̈ɔ̈u ka tɔ̈ɔ̈u ka tɔ̈ɔ̈u ka tɔ̈ɔ̈u ka tɔ̈ɔ̈u ka tɔ̈ɔ̈u.
10, accessories sugandin: main ye bracket sugandin, bracket material ye wall thickness 1.5-2mm square steel and angle iron, welding density and structure must be reasonable, adjusting bolt must be rotated smoothly.
11, Installation and debugging: generally first with a frame-shaped leveler to align, in the use of optical image leveler or electronic image leveler to make a plane error measurement, if there is a problem you can ask the platform manufacturer to field shovel scraping.
12, luɔ̈ɔ̈i path: Cast iron platform can be used after debugging finished, room temperature control at 20±5°C to make, on the desktop detection workpieces to be light and light and move, don't concentrate on using a single area, try to uniformly use the entire cast iron platform area. Our company direct selling marble platform can customize according to drawings Welcome to buy Consulting hotline:
